Grid Study for development of the power supply system of Al Watania Agriculture Co.
Client:
Date of completion:
29.06.2022
About project:
Al Watania is a major agricultural company in KSA and Middle East. Main business process that is mostly energy-consuming is water irrigation.
02
Name:
Gas Chemical Complex within Ethane-rich Gas Processing Complex
Client:
Date of completion:
30.10.2023
About project:
Design of 110/10 kV step-down substations.
1. Layout of the land
2. Structural anв space planning solutions
3. Engineering networks and equipment design
4. BIM-model development5. Designer supervision
03
Name:
7 MWp Capacity Ground Mount PV Plant connected at 22 KV for Khazna Data Center Masdar City
Client:
Date of completion:
30.06.2023
About project:
The new generation object is 7 MWp PV plant with an up linking voltage of 22kV voltage for connection to the current grid.
The new generation object is 7 MWp PV plant with an up linking voltage of 22kV voltage for connection to the current grid. Future connection of PV plant MV station to the MV intake room of Khazna Data Centre takes almost 1.4 km distance. In order to minimize the impact of new PV plant and thus optimize the functioning of the system, grid simulation and recommendations have been be provided by the Volts team with validation by the client.The output power of the PV plant is carried out through MV station MVS6400 which consist of one three winding transformer with rated power 6,4 MVA. Generating equipment is connectedto two LV buses and consists of 19 Sungrow SG 320 HX inverters with rated capacity 320 kW.
04
Name:
Reconstruction and digitalization of distribution grid area in St. Petersburg
Client:
Date of completion:
30.05.2023
About project:
35 km of cable and overhead lines and 140 transformer substations reconstruction and retrofit design
List of works:
-Grid study, survey and data collection
-Grid simulation and optimization of grid topology study
-Feasibility and economical calculations
-35 km of cable and overhead lines and 140 transformer substations reconstruction and retrofit design
05
Name:
Development of a tourism cluster in the Murmansk region
Client:
Date of completion:
in progress
About project:
Power System Design and Modeling
List of works:
-Analysis of the optimal power generation source (solar/diesel gen/micro hydro/gas piston units)
-Power System Design and Modeling
-Selection of basic equipment (storage, solar panels, inverters, etc.)
-Digital twin simulation of microgrid yearly consumption
-Microgrid management and monitoring software
06
Name:
PV power plant for school in Nur Sultan
Client:
Date of completion:
2021
About project:
Power System Design and Modeling
List of works:
-Feasibility study
-Power System Design and Modeling
-Detailed design documentation
-Supply and construction-Microgrid management and monitoring software
07
Name:
On-grid PV power plant in Aktau
Client:
Date of completion:
2018
About project:
Power System Design and Modeling
List of works:
-Feasibility study
-Power System Design and Modeling
-Detailed design documentation
-Supply and construction
08
Name:
Industrial battery energy storage system (BESS) 250 kW power, 355 kWh capacity
Date of completion:
2024
About project:
The pilot project aims to boost the office building's energy efficiency and cut electricity costs.
List of works:
-Feasibility study
-Power System Design and Modeling
-Detailed design documentation
-Supply and construction
09
Name:
60MW hybrid power plant microgrid control system development
Client:
Date of completion:
2024
About project:
The power generation system consists of a 22 MW wind farm, a 20 MW PV plant, a 20 MW HFO plant, and a 12 MW battery energy storage system (BESS).
List of works:
-Feasibility study
-Power System Design and Modeling
-Detailed design documentation
-Supply and construction
10
Name:
National Plan for E-Mobility Azerbaijan
Client:
Date of completion:
2024
About project:
National Plan for E-Mobility Azerbaijan
List of works:
-Feasibility study
-Power System Design and Modeling
-Detailed design documentation
-Supply and construction
11
Name:
Grid Study for the 2GW Wind Project in Uzbekistan
Client:
Date of completion:
2024
About project:
2GW wind power plant development with connection to Uzbekistan national grid, Navoii region
List of works:
-Feasibility study
-Power System Design and Modeling
-Detailed design documentation
-Supply and construction